4000m2 of 300mm thick 40 mpa structural walls
Read More
Evolution Shotcrete was hired to stabalise a range of slopes that had loose gravel and soil. This project required the use of rope access and resulted in an ‘off the gun’ finish and 900 m2 of.
Read More
The Seaford Rail Extension was part of the South Australian Government’s 10-year plan to revitalise Adelaide’s passenger transport system to the southern suburbs. Evolution was engaged to Shotcrete the walls in and around the station. The.
Read More
Evolution Shotcrete was engaged to undertake batter retention around several Santos compressor hubs. Fibre crete Shotcrete was a good solution due to the fact there is zero maintenance required after the application, and which suited our.
Read More
This was a 6 stage project and total of 13000m2 of reinforced shotcrete walls with float finish.
Read More